![]() ![]() |
|||
Projects |
Teravista Lift Station - Round Rock, Texas
Services:Survey Preliminary Design Report Final Design Construction Administration Inspection The Teravista Lift Station consisted of three submersible wastewater pumps and serves as the primary lift station for the Tervista single family development in the City of Round Rock. The design consisted of three pumps, each rated at 950 gallons per minute, providing a firm pumping capacity of 1,530 gallons per minute (2.2 MGD) with 25 horsepower motors. Wastewater is pumped through 2,500 linear feet of 12-inch diameter force main to the City's wastewater collection system. Bury designed the lift station, including all structural, electrical, mechanical and civil components and the force main serving this lift station. The lift station is designed to accomodate 3,000 LUEs in the Teravista development. The lift station design also incorporated odor control and full instrumentation into the final design and was designed in accordance with TCEQ and City of
|
|||||||||||
©2006 Bury+Partners, Inc. All rights reserved. Web design and development: Stylefish |
||||||||||||