Bury + Partners Engineering Solutions
CompanyServicesProjectsCareersNewsContact Us

Projects

View All Projects

Search Projects:


Browse by Service/
Market Sector:

Browse by Location:

Project Portfolio 100 percent for you

Temple Airport Hangar - Temple, Texas

 
 

Services:

Water Pressure Analysis • Site Plan • Water/Wastewater Plan • Paving & Drainage Plan • Stormwater Collection • Grading • Water/Wastewater Construction Documents • Bidding Phase Services • Construction Phase Services


Bury teamed with Architectural Edge, Inc, to provide the City of Temple with site plans for a new 50,000 square-foot hanger and a solution for inadequate pressure to serve both new construction and the airport's ultimate master plan.

The project consisted of a civil-site phase for the proposed hangar construction, and water pressure analysis of the master plan for the airport, assessing average and peak flow requirements associated with ultimate build out conditions, and then determining a cost effective solution to meet current and future needs.

Bury provided the City with complete site, paving, drainage, stormwater collection, grading, water and wastewater plans and specifications, which included specific design consideration for adherence to both FAA Airport Design Guidelines as well as specific guidance for military airport design.

Additionally our analysis of the water system and elevated storage tank serving the airport provided the City and the airport with a booster pump-station which provides for current and future system pressure needs.


 


 
 

©2006 Bury+Partners, Inc. All rights reserved. Web design and development: Stylefish